Polaris 2003 MSX Uživatelský manuál Strana 77

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 114
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 76
75
MAINTENANCE AND LUBRICATION
Periodic Maintenance Schedule
NOTE: Maintenance intervals are based upon average
operating conditions. Watercraft operated in saltwater
require daily corrosion protection and engine flushing,
and more frequent maintenance and lubrication.
Fogging kits should be added to all Polaris watercraft.
The engine should be fogged if the watercraft will not
be used for more than 48 hours.
Maintenance Schedule Key
* Perform every 15 hours or monthly when
operated in salt water.
** Perform daily when operated in salt water.
*** Spider rubber coupler, driveshaft and bearing
carrier (seals and bearing) - Perform pre-season
(annually), at 50 hours and when pump is
disassembled for maintenance.
Zobrazit stránku 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 113 114

Komentáře k této Příručce

Žádné komentáře